Reuss: Obere Welle (Fällbaum), Bremgarten
III-IV 0.33 km direct
graph
Reuss @ Mellingen 163.01 m³/s @ 19:40
130 | 170 | 230 m³/s



Karte | Wetter, Verkehr, ... | Einen neuen Eintrag erfassen


Resultate 1 - 6 von 6

Fahrverbot

 
 #5779 • 06.04.2024 18:25 •
Fahrverbot
The annual openings and closings of the Fällbaum weir are carried out by the Pontonier-Fahrverein Bremgarten.

The weir is generally opened around the beginning of May, however a suitable water level is required, so no specific date can be set.

The closure takes place around the end of September, again depending on water levels.

The opening and closing of the weir is usually communicated via the website of the Pontonier-Fahrverein https://www.pontoniere-bremgarten.ch/

Some photos of the 2019 closure operation are here:
https://www.pontoniere-bremgarten.ch/2019/10/fallbaum-geschlossen-2/
 
 #4248 • 03.05.2021 13:33 •
Info | 10.07.2015
A couple of impression photos

 
 #3808 • 21.06.2020 11:27 •
Befahrbarkeit | 27.06.2018
Seltener Bodenkontakt xD
 
 #3055 • 03.09.2018 22:34 •
Info
Pegel 130 - 180 - 230 m3

Zum surfen:

130 - ca.160m3 Welle
ca.160 - 230m3 Walze
Übergang kontinuierlich ...

unter 130m3 & über 230m3 bildet sich keine Welle/Walze, sondern das Wasser fliesst einfach den Bach runter ...

Über den Winter ist die Welle jeweils mit Holz verbarikadiert, um das restliche Wasser ins Kraftwerk abzuleiten ...
Öffnung im Frühling immer unterschiedlich ...
 
 #2369 • 12.03.2017 15:11 •
Befahrbarkeit
Obere Welle Bremgarten:180-220qm Walze; < 180qm immer mehr Welle, schnelle Boote können bis 90qm blunten;
 
 #54 • 14.06.2009 13:01 •